Retroactive Grant for Ranch Visit (10/14/24-10/16/24)

Task Completed:

  • setup testing workstation
  • conducted CAN throttle testing for entire propulsion system
  • troubleshooting companion PC
  • troubleshooting FPV camera and installation
  • charged multiple PT3 batteries
  • Embention call for MEX troubleshooting
  • Soldered USB-C power module for testbed ground station receiver
  • Repaired desoldering pump
  • welding aid
  • cleaned working area

Task Not Completed:

  • testbed flights
  • inspection of contactor connections
  • updated power design for FPV camera installation on PT3

A detailed breakdown of the work done can be found in the Ranch Hourly Log spreadsheet.

Pay Calculation

  • Hours completed: 26
  • Level 4 pay rate: $64/hr
  • Requested pay: 1664
  • 25% Pay in Arrow: ($416/.3)(1.5) = 2080 $ARROW

Pay request total: $1248 USDC+ 2080 $ARROW

Travel Expense Reimbursements:

  • Gas: $83.60
  • Previous visit gas (no grant requested): $78.35+43.09+58.29
  • Costco expenses: $109

Total request: $1,440.66 USDC + 2751 $ARROW



3 Likes

I’ll take a lack of response as a green light to queue the transaction.

1 Like

We definitely need to plant some vegetables such as potato in the ranch instead of eating Quakers

lol I just honor the request made